Regulations of Connecticut State Agencies
Within thirty days subsequent to the construction or major reconstruction of any of its pipe line facilities, every company shall certify to the commission that the pipe line has been tested and meets the requirements of the standard code and regulations prescribed by the commission for the stated maximum service pressure at which it will be operated. The certification shall also state (1) pressure at which the lines were tested, (2) computations of maximum allowable working pressure in accordance with the provisions of the standard code and (3), in the event of air or inert gas tests, measurements of leakage obtained by the testing.